Oral Roberts University Prayer Tower
This stunning building was built in 1966 and was long overdue for some new air conditioning. In 2010 I was hired to design the retrofit HVAC system. The existing system was a chilled water multizone Air Handler with 10 zones. Everything going in or out of this building had to fit though a 3' door. The existing multizone unit was very large and had to come out in pieces. I replaced it with three ENVIRO-TEC VB series chilled water Blower Coil units. The architect told me the owner was very pleased with the new installation.